• menu
    VOC waste gas treatment in hazardous waste temporary storage
    Scheme  introduction

    The gas composition in the pit of solid waste and hazardous waste pretreatment workshop and incineration workshop is complex, which contains a large amount of acid gas and alkaline gas

    Treatment process: in the first step, the washing deodorization process is adopted, which uses the characteristics of neutralization reaction and dissolution in water between the pollutants in the waste gas and the alkaline absorption solution. In the second step, the activated carbon adsorption method is adopted to effectively adsorb the organic waste gas insoluble in water, so as to achieve the purpose of deodorization. Regularly discharge the washing deodorization equipment to the sewage treatment system for treatment.

    Main features of the equipment: the washing tower adopts acid / alkali washing and water washing integrated tower + activated carbon adsorption for waste gas purification treatment, automatic control, up to standard discharge, small floor area, simple and convenient control operation, good treatment effect and low maintenance cost.




    applicationcase

    光大(連云港).jpg

    Everbright (Lianyungang)

    光大(黃石) (2).jpg

    Everbright (Huangshi)

    4e577afd696d5ea2a346d2eca90f6b5.jpg

    Suez

    021e49eaeb54861bcf002dc84645cc1.jpg

    Suez

    54551616eb642e250c2114354cee1e0.jpg

    Suez

    宜昌七朵云.jpg

    Seven clouds in Yichang

    光大(臨沭).jpg

    Everbright (Linshu)

    光大(鹽城).jpg

    Everbright (Yancheng)

    中文字幕